Knopp Startseite

Home | Choose language:

English English français

Mittwoch, 01. August 2018

Donnerstag, 20. April 2017

Zaha Hadid's Port House in Antwerp

Strong performance by CONTOPP® Fibercompound Duremit hydro

Mittwoch, 30. November 2016

KNOPP Green Screeding Technology

CONTOPP® Admixtures listed in DGNB Navigator

Montag, 12. September 2016

Classic Case of flooring: The Alfa Romeo Museum in Arese, Italy

Where history meets future

Montag, 02. June 2014

KNOPP Green Screeding Technology

CONTOPP® Admixtures listed in DGNB Navigator

Freitag, 20. September 2013

New landmark for Abu Dhabi!

CONTOPP® Accelerator 10 strengthens Aldar Headquaters

Freitag, 20. September 2013

Mumbai Chhatrapati Shivaji Airport

New Terminal 2 equipped with CONTOPP® Accelerator 10

Ready-to-lay in 10 days

Reference Westpark Center Ingolstadt
Five crews worked simultaneously on laying the screed to ensure the extension work to one of the largest shopping centres in Southern Germany would be ready on time. This called for a super quick ready-to-lay.

 

The Ingolstadt Westpark Center was expanded by 20.000 m2. The Civilis Grundstücks Vermietungsgesellschaft mbH invested 40 million Euro in the extension work. Considerable demands were also placed on the flooring. The requirement profile specified a screed on a separation layer with a screed thickness of up to 90 mm in some areas, a guaranteed early ready-to-lay of ten days and a strength class of CT-C35-F5. Leitinger from Ingolstadt were awarded the contract. The company has been operating for 55 years. Its range of services includes flowing screeds, cement screeds, cavity space flooring, raised flooring, thermal insulation, sound insulation and waterproofing for new builds, conversions and renovations.

 

To ensure they could fulfil the requirement profile and to achieve a quick ready-to-lay despite the screed thickness, the company used CONTOPP® Accelerator 15 and 20 Compound in conjunction with CONTOPP® Duremit PB from Knopp. The screed was constructed by five crews working simultaneously. Franz Schneider, Head of the Leitinger screed department: "With CONTOPP® Accelerator Compounds I know that I´ll achieve a precise ready-to-lay and can be sure that the screed cannot absorb any room moisture once it has dried.”

 

The work was completed recently and the shell construction passed on in good time for the further development. The extension is set to open in the spring of 2012. With over 52.000 m2, of which 32.000 m2 is sales area, the Westpark Center which was opened in 1996 and has 145 shops and over 3.000 parking spaces, is one of the largest shopping centres in Southern Germany. The center, which was designed by the Helmut und Klaus Stich architects office in Ingolstadt, combines everything that the shopper´s heart desires under one roof. This past year has seen 5.8 million people visit the Westpark Center. The Cinestar cinema, with over 570.000 visitors per annum, is a particular attraction.

 

Property facts
Property: Ingolstadt Westpark Center
Company: Leitinger GmbH, Ingolstadt
Area: 20.000 m2
Product: CONTOPP® Accelerator 15 and 20 Compound in conjunction with CONTOPP® Duremit PB

Knopp GmbH Chemische Produkte

design & cms by agentur.3wm